Photovoltaic demonstration project in steel mill works steady.
The first phase of Jinxi Iron and Steel distributed photovoltaic project uses the roof, slope,avenue and open space in the factory to build photovoltaic 42MW project, all the photoelectric power generated is used for factory production.
Huawei intelligent photovoltaic module controller is installed in the green space plate, and the future power generation and load are predicted through AI algorithm. Combined with the electricity price model of the owners, the global optimal electricity consumption strategy is formed to help factories, enterprises and parks transform into green and low-carbon.
After comparative tests, the power generation of the system increased by 3.31% after the installation of intelligent component controller. Since the project was connected to the grid, the power generation of the inverter has remained efficient and stable.