The plant applies block mill as well as SME’s customized scheme. With the optimal process layout and quality management, it takes only two weeks to reach the design capacity after hot trial operation.
Main equipment configuration:18-stand H/V mill, 6 non-twisted block mill, vertical loop, laying head, flying shear, converter, side loop, gripping shear, TMT guide slot, slow cooling guide slot, pinch roller, laying head, air cooling table, coil collection station, double mandrel, and bundling machine and other facilities.